Sections

About Us

 
Make a Donation
Local • Independent • Essential News
 
Photo by Nathan Berneir/KUT. The $2.9 million segment of the Violet Crown Trail meanders through a wooded area and underneath MoPac, connecting the end of Home Depot Boulevard to the Garza Ranch development near the Arbor Trails Shopping Center.

With missing link in place, Violet Crown now offers 11 miles of uninterrupted trail

Monday, July 31, 2023 by Nathan Bernier, KUT

A mile-long missing link in the Violet Crown Trail is now complete and open to the public. This new segment in Sunset Valley guides trailblazers from the end of Home Depot Boulevard, through a wooded area, under MoPac Expressway and up to the Garza Ranch development close to the Arbor Trails Shopping Center.

With this new link in place, the 11-mile trail now runs unbroken from Barton Springs Pool in Zilker Park to Slaughter Creek near MoPac. And by the end of 2024, another segment is planned to reach 1.7 miles farther from Slaughter Creek to the Lady Bird Johnson Wildflower Center.

“It reminds us of the peaceful reward we get from connecting to nature,” Hill Country Conservancy CEO Kathy Miller said of the Violet Crown Trail. “Then you emerge and you realize, right in the middle of this thriving city, I have access to this incredible natural wonder.”

Courtesy of city of Austin. The new section of Violet Crown Trail runs from Home Depot Boulevard, under MoPac Expressway and into the Garza Ranch development. Eventually, it will connect to a yet-to-be-constructed segment of sidewalk along the MoPac frontage road.

Designing and building the trail segment cost $2.9 million. About 43 percent of that was covered by federal grants from the Capital Area Metropolitan Planning Organization; the rest was paid for by bonds Austin voters approved in 2012 and 2016. The Hill Country Conservancy will maintain the trail.

The Violet Crown Trail is a varied mix of paths. Some sections are rugged, rocky and wild. Others – like the new segment in Sunset Valley – are 10-foot wide, ADA-accessible hike-and-bike trails with a crushed granite surface. In certain areas, the trail relies on public sidewalks, putting hikers alongside streams of noisy traffic.

Courtesy of Hill Country Conservancy. Another segment of the Violet Crown Trail is planned to reach from Slaughter Creek to the Lady Bird Johnson Wildflower Center by the end of next year.

The jigsaw puzzle of paths reflects the challenges of assembling a trail across different terrains and through multiple jurisdictions.

Looking to the future, the Hill Country Conservancy plans to extend the Violet Crown Trail another 17 miles south to the Onion Creek Management Unit in Hays County.

If that happens, the trail could connect with the proposed Emerald Crown Trail and continue to San Marcos, forming a regional trail more than 60 miles long. The Emerald Crown Trail Master Plan even imagines a connection to other trails continuing to San Antonio – creating a pedestrian link from the cool waters of Barton Springs Pool to the Alamo City.

This story was produced as part of the Austin Monitor’s reporting partnership with KUT.

The Austin Monitor’s work is made possible by donations from the community. Though our reporting covers donors from time to time, we are careful to keep business and editorial efforts separate while maintaining transparency. A complete list of donors is available here, and our code of ethics is explained here.

You're a community leader

And we’re honored you look to us for serious, in-depth news. You know a strong community needs local and dedicated watchdog reporting. We’re here for you and that won’t change. Now will you take the powerful next step and support our nonprofit news organization?

Back to Top